On this page
- Quick answer: the eight criteria and how to weigh them
- The comparability trap
- What the weights are really doing
- Total cost, not unit price
- Manufacturing perspective: what a factory sees in your comparison
- Testing before you commit
- Practical example: the cheapest quote and the real one
- Common mistakes
- How to compare us against anyone
- Frequently asked questions
- Conclusion
This is about the comparison stage: how to make competing quotes genuinely comparable, what to weigh beyond the unit price, and how to test a supplier with something smaller than a full order. Finding suppliers is how to source a manufacturer, the wider selection framework is choosing a womenswear manufacturer, and this article assumes you have a shortlist.
It exists because the most expensive mistake in sourcing is not choosing badly. It is choosing on numbers that were never measuring the same thing.
Quick answer: the eight criteria and how to weigh them
Below is a scorecard. The weights are ours, and reasonable people weight differently depending on whether they are buying a first order or protecting a season — but the important part is that competing suppliers are scored on the same eight, with the same weights, before anyone is chosen.
| Criterion | Weight | What to actually look at | Supplier A | Supplier B | Supplier C |
|---|---|---|---|---|---|
| Capability fit | 20% | Have they made this category, this construction, this fabric | |||
| Quote comparability | 15% | Same fabric, same construction, same size range, same incoterm | |||
| Quality system | 15% | Agreed standard, inline and final inspection, tolerance discipline | |||
| Communication | 12% | Answer quality and speed on technical questions | |||
| Lead time realism | 10% | Whether the date accounts for development or assumes it away | |||
| Flexibility | 10% | Willingness to run a small first order or a test style | |||
| Commercial standing | 10% | Verifiable address, consistent banking details, references | |||
| Total cost, not unit price | 8% | Sample, freight, packing, rework risk, payment structure |
Leave the three supplier columns blank and fill them in as you go. A scorecard is not a decision-maker — it is a device for making your own reasoning visible, which matters most when one supplier is charming and another is not.
The comparability trap
Two quotes for “a lined satin midi, 500 pieces” are not comparable, because the sentence does not specify enough to produce a fixed price. What differs silently is usually one of these.
- Fabric. “Satin” covers a wide range of weights and qualities. A cheaper cloth is a cheaper quote and a different garment.
- Construction. Lined or half-lined, interlined or not, boned or soft, invisible or exposed zip. Each changes the operation count.
- Size range. A quote for three sizes and a quote for eight differ in grading, marker complexity and fabric consumption.
- Trims. Hardware is a real line item and is easy to leave vague.
- Packing. “Standard export packing” means different things in different places, and the difference shows up as freight and re-labelling.
- Incoterm. A price at the factory gate and a price delivered are not the same number and should never be put in the same column.
The fix is a like-for-like brief: one document, one version, sent unchanged to every supplier, with the specification fields complete and a requirement that anything a supplier cannot meet at that specification is named rather than silently substituted. Suppliers who respond by flagging a problem are usually the ones worth talking to.
What the weights are really doing
The weights in the scorecard above are not neutral, and it is worth knowing what they assume.
- Capability fit carries the most weight because a supplier who has made this category before is not learning on your order. Everything else is largely a matter of process; this one is not.
- Unit price carries the least, deliberately. It is the easiest number to compare and the least informative, because it is the one most easily produced by leaving something out.
- Communication is weighted below quality because a supplier with a good system and a slow sales desk still ships a good garment, whereas the reverse is not true.
- Flexibility is weighted mid-range because it matters greatly on a first order and barely at all once you are placing volume.
If you are a new brand, shift weight from commercial standing towards flexibility and communication. If you are protecting a season, shift it towards lead time realism and quality system. The criteria do not change; the weighting expresses who you are as a buyer.
Total cost, not unit price
The unit price is one line in a longer calculation, and the lines around it are the ones that decide whether a cheaper quote was actually cheaper.
| Cost line | Where it hides | How to compare it |
|---|---|---|
| Sample and development | Quoted separately, or not at all | Ask what is charged and whether it is credited against production |
| Fabric at the specified quality | Inside an unnamed cloth | Insist the article or the behaviour is named in the quote |
| Trims and hardware | Inside “standard trims” | Itemise the trims that matter |
| Packing and carton spec | Inside “export packing” | Specify fold, bag and carton dimensions |
| Freight and volumetric weight | Outside the quote entirely | Compare landed cost, not ex-factory cost |
| Inspection and rework | Unpriced until it happens | Agree the standard and who pays for rework |
| Payment structure | Sometimes a hidden cost of capital | Compare the deposit and balance schedule, not just the total |
Two suppliers can quote the same unit price and produce different landed costs by a margin larger than the price difference they are competing on. Comparing ex-factory prices alone is how a brand ends up with a cheaper supplier and a more expensive garment.
It is worth building this table before any quotes arrive, so the fields you need are requested rather than chased afterwards. A supplier asked for carton dimensions and an incoterm at the enquiry stage answers them in the first reply. One asked for the same information after the price has been agreed has to go and check, which costs a week and produces a revised number.
Manufacturing perspective: what a factory sees in your comparison
A useful thing to know before you send a like-for-like brief: the same brief that makes quotes comparable also tells a factory what kind of buyer you are. Three behaviours are read immediately.
- A complete specification gets a careful price. A costing desk can price a defined garment accurately. A vague brief gets a cautious number, because the uncertainty has to be covered somewhere.
- A stated target price changes the answer. A factory told the target can tell you which construction choices reach it. One not told will quote what you described and let you discover it is unaffordable.
- A question about capacity gets a different answer from a question about price. Asking what else is on the line, and when, tells you whether your date is real — and it signals that you intend to check.
Testing before you commit
Comparing on paper has limits. The most reliable comparison is a small piece of real work, and it is usually worth doing before a full order.
- Send the same brief to every shortlisted supplier. Identical specification, identical quantity, identical incoterm.
- Ask each to quote and to name anything they cannot meet. The answers to that second request sort the list more than the prices do.
- Commission a sample from the two strongest. Not from all of them — samples cost time and money on both sides.
- Compare the samples against the specification, not against each other. The question is which one meets the brief, not which one is nicer.
- Ask what they would change. A supplier with a view on your construction is a supplier who read it.
- Place a small first order with the winner. Technically modest, so the process is tested rather than the supplier's ceiling.
The purpose of the sample round is not to find the best garment. It is to find out how a supplier behaves when something in the brief is ambiguous — because that is the behaviour you will get for the whole relationship.
Keeping the comparison from costing more than it saves
A comparison has a cost, and it is paid in the same currency as the project: time. Four habits keep it proportionate.
- Fix the shortlist before you write the brief. Sending a full specification to eight suppliers produces eight sets of questions and one very long week.
- Timebox the replies. A supplier who needs three follow-ups to answer one technical question has already told you something about the relationship.
- Sample two, not five. The third and fourth samples rarely change which supplier is right, and they always cost a fortnight.
- Decide, then move. A comparison left open while one more quote arrives delays the order by exactly the length of the wait, and the answer is usually the same as it was a week earlier.
The point of a comparison is a decision rather than a ranking. Once the field is down to two and one has answered the technical question better, further analysis is procrastination with a scorecard attached.
Practical example: the cheapest quote and the real one
Three quotes arrive for 500 lined satin midis across five sizes.
| Supplier A | Supplier B | Supplier C | |
|---|---|---|---|
| Quoted unit price | Lowest | Middle | Highest |
| Fabric stated | “Satin” | Article named, weight given | Article named, with an alternative |
| Construction | Lined | Lined, interlined bodice, stated seam finish | Lined, interlined, boned panel |
| Size range priced | Three sizes | Five sizes | Five sizes |
| Packing | “Export packing” | Carton dimensions and weight given | Carton spec plus marketplace-ready packing |
| Inspection | Not mentioned | Standard stated, inline and final | Standard stated, with a tolerance chart |
| What the comparison shows | Cheapest garment, not the cheapest price for this garment | Comparable to the brief | More than the brief, priced accordingly |
Supplier A is not necessarily a bad choice — but it is not offering the same thing, and until that is established the price difference is not information. The productive move is to go back with the specified construction and ask for a price against it. A supplier that can meet the brief will re-quote; one that cannot has told you something useful for free.
Common mistakes
- Comparing unit prices from differently specified briefs. The most common and most expensive error in sourcing.
- Putting ex-factory and delivered prices in the same table. They are different quantities.
- Letting a single number decide. A scorecard exists to stop one criterion dominating by being vivid.
- Sampling every supplier. Two is usually enough to separate the field.
- Skipping the small first order. A trial order is cheap information about the relationship, not just the garment.
- Choosing on responsiveness alone. The supplier who agrees to everything has committed to nothing.
- Ignoring whose name is on the invoice. It should match the party you believe you are contracting with.
How to compare us against anyone
Luxudress has manufactured womenswear in Guangzhou since 1995, with pattern, cutting, sewing, finishing and packing under one roof. We would rather be compared properly than win on an unspecified brief.
- Send the same brief to us and to anyone else. We will quote against it and name anything we cannot meet.
- We state the construction. Lining, interlining, closure and finish are in the quote rather than implied.
- We price the size range you asked for. Not a narrower one that flatters the number.
- We reply within 24 hours. With technical answers, including the ones that are inconvenient.
- We name the risks. If a fabric, a silhouette or a date is a problem, you hear it before the order rather than after.
- We can start with a small order. A test style is a reasonable way to begin a relationship.
If you are running a comparison now, send us your brief and the specification you are sending everyone else. Comparing like for like is the whole point. Our production process explains how we would run the order, and quality control covers the standard we inspect against.
Frequently asked questions
Why is one quote so much lower than the others?
Almost always because it is pricing a different garment. The usual causes are a cheaper cloth, a simpler construction, a narrower size range, unspecified trims or a packing specification that will cost you later in freight. Send the specified construction back and ask for a price against it — the gap usually narrows.
How many manufacturers should I compare?
Three is a workable number. Fewer and you have no reference for what is normal; more and the comparison cost — briefs, samples, follow-ups — starts to exceed the value. If one falls away during the process, replacing it is usually better than starting with six.
Should I order samples from all of them?
No. Use the brief and a technical question to narrow the field to two, then sample those. Samples are the most expensive part of a comparison, in time on both sides as well as money, and the third and fourth samples rarely change the answer.
Is a small trial order worth it?
It is the single most informative thing you can do before committing. A trial order tests the parts a quote and a sample cannot: how the supplier handles a change, how inspection works in practice, whether the invoice matches the quotation. Keep the trial style technically modest so you are testing the process rather than the supplier's limits.
Two suppliers quoted the same price. How do I choose?
Score them on the other seven criteria. Equal price with a clearly better quality system, a more realistic lead time or a more capable answer to a technical question is not a close call. If they score similarly across the board, the trial order is the tie-breaker.
How do I compare my current manufacturer against a new one?
Include your current supplier in the same brief, on the same terms, and score them the same way. The most common finding is that the incumbent is competitive on price and ahead on lead time — which is worth knowing before you move production for a small saving. If you do move, having your own patterns and approved swatches is what makes it straightforward.
Can I use one quote to negotiate with another?
You can, and it works best when the quotes are genuinely comparable. Against an unspecified lower quote it is a weak position, because the supplier can simply match the specification rather than the price. Fix the brief first; negotiate second.
Conclusion
Manufacturers are not hard to compare because of secrecy. They are hard to compare because a quote is only meaningful against a specification, and most briefs leave the specification open. Fix that first and the rest of the process becomes ordinary — a shortlist, two samples, a scorecard, a small order.
Weight capability above price. Compare landed cost rather than ex-factory cost. Test the relationship with a trial order before you test it with a season. Those three moves will do more for your sourcing outcome than any amount of negotiation on a number that was never measuring the same thing.